These are the questions homeowners in Macomb Township and nearby Macomb County ask most before hiring an excavating crew. Answers are general guidance, not a quote or engineering advice for your lot.

Are you the excavating company that will dig my job?
No. Macomb Township Excavating is a referral service. We connect you with an independent local excavating contractor. They provide the quote, equipment, insurance and workmanship.
Do I have to call MISS DIG before digging?
Yes. Michigan law requires calling MISS DIG 811 at least three business days before excavation so underground utilities can be marked. Your contractor normally handles the ticket, but confirm it before machines start.
How deep is frost in this area?
Building departments in Southeast Michigan commonly reference frost depths around 42 inches for footings, but the exact requirement is set by your local code official. Ask the contractor and your building department for the depth that applies to your permit.
Why does clay soil change the price?
Macomb Township and nearby Chesterfield and Clinton areas include dense lake-plain clay that stays wet after storms. Excavators plan for sticky buckets, soft truck access and trench walls that need attention when saturated. Wet clay sticks to buckets, needs more drying or stabilization, and can require wider benches or different spoil handling. That shows up in machine time and trucking.
Roughly what does basement excavation cost?
Published national guides such as HomeGuide's basement cost overview discuss wide ranges because depth, access, spoil haul-off and waterproofing vary so much. Only a site visit produces a real number for a Macomb Township lot.
Can you dig next to my house for a French drain?
Often yes, with a mini excavator or by hand near utilities. Tight side yards, decks and underground lines slow the work. Photos help the contractor plan.
Do I need a permit?
Many excavating tasks tied to foundations, pools, septic work or grading changes need permits from your city or township. The contractor or your builder usually pulls them; rules differ between Macomb Township and neighboring communities.
What should I clear before the crew arrives?
Move vehicles, mark pet fences, show where sprinkler heads and invisible dog fences run, and unlock gates wide enough for equipment. Tell the contractor about wells, septic tanks and buried propane lines.
How do spoil and fill dirt work?
Digging creates spoil that must be hauled off or reused as fill. Clean fill and topsoil are different materials. Ask whether haul-off is included and where trucks will stage on your street.
How fast will someone call me back?
We aim to connect you with a local pro quickly. Response time depends on season and how complete your details are. For urgent issues such as a collapsed line or active flooding, call the number on this site and say it is urgent.
How do I know if I need an excavator or a landscaper?
If the job needs a machine to move cubic yards of soil, cut to foundation elevations, trench for utilities or break concrete, you want an excavating contractor. Landscapers handle finish grading, beds and softscape after the heavy work.
Will the crew fix my lawn when they leave?
Many excavating quotes include rough grade only. Seed, sod, irrigation repair and fence fixes are often separate. Ask what "restoration" means in the proposal.
Can excavating be done in winter in Michigan?
Yes, with limits. Frost slows production and can raise cost. Some pours and waterproofing steps prefer milder temperatures. Discuss season adders up front.
What is the difference between fill dirt and topsoil?
Fill dirt is used to build elevations and is often poor for growing grass. Topsoil is the darker growing medium. Mixing them in the wrong layer causes lawn and drainage problems later.
Documentation Worth Keeping
Save the written quote, change orders, dump tickets if provided, and photos of the open hole before backfill. Lenders and future buyers sometimes ask what was done beside a foundation. Photos of marked utilities before digging also protect everyone if a private line was missed on the locate.
Communication During the Job
Ask who your day-of contact is—owner, foreman or both. Weather calls happen. A short text that the crew is delayed beats wondering why the street is empty. If you will not be home, leave gate codes and a marked priority list (what must be done first if time runs short).